The Town of Breckenridge, Colorado


Re-design and re-construction of the Breckenridge’s existing pump track

Arrowhead Trails was pleased to accept the invitation from the Town of Breckenridge to consult and work with Breck’s exceptional in-house trail crew in the re-design and re-construction of the town’s existing pump track. The scope of the project was to add on roughly 300 feet of new track while incorporating the existing pumptrack features that locals had been enjoying for years.

Arrowhead composed the design of the new track features and directed and instructed pump track shaping and packing techniques to the Town’s expert trail crew members. The project was a success and the Town of Breckenridge had a nice new track to enjoy within a week’s time!

http://www.townofbreckenridge.com/